Project Scope
The project involves the refurbishment of the Grade II listed Harpenden Hall, which provides office accommodation to a number of local businesses. The attic space, originally used as residential accommodation, was repurposed as storage space. This overloading caused failure in one of the main supporting oak beams. Skeletal Consulting Engineers were employed to design sympathetic remedial works to the beam to minimize the impact on the heritage asset. The remedial works were successfully completed using carbon fibre rods/strips and specialist adhesive.
Summary
Location: Harpenden Hall, Harpenden
Client: Private
SCE Scope
Visual Structural Survey: Conducted to assess the existing structural elements and understand the structural arrangement
Structural Design: Included the design of remedial works for the main supporting oak beam using carbon fibre rods/strips and specialist adhesive
Structural Calculations: For the remedial works, ensuring stability and compliance with safety and building regulations
Statistics
Project Duration: The project started in February 2021 and was completed successfully
Building Design: The refurbishment included the use of carbon fibre rods/strips and specialist adhesive for the main supporting oak beam
Image credits: Skeletal Consulting
Location
Harpenden Hall, Harpenden
Client
Private Owner
Project Duration
Completed in February 2021
Join the team
Are you a talented structural engineer / technician looking for an exciting opportunity? Join our dynamic team of Bristol based experts and contribute to innovative projects that shape the future. If you're passionate about engineering and eager to make a difference, we'd love to hear from you!
Get in touch
Are you interested in a service we provide or have a project you would like to discuss with us? If so, please do get in touch!